Outcome-based software-defined infrastructure
US9729421B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 25, 2015 |
| Grant date | Aug 8, 2017 |
| Priority date | — |
| Expiry date | Oct 22, 2035 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L67/51
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
A method and system for outcome-based adjustment of a software-defined environment (SDE) that includes establishing a link between a business outcome and a first resource configuration from software defined environment, establishing a monitoring mechanism for continuously measuring a current state of the SDE, using a behavior model of the SDE to anticipate, or forecast, a triggering event, and responsive to the forecast of a triggering event, using the behavior model to determine a second resource configuration to achieve the business outcome. The link includes at least one of a utility of services for the business outcome, a cost of a set of resources consumed by the first resource configuration, and a risk of the set of resources becoming unavailable.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.