Patent · US Active

Estimating well production performance in fractured reservoir systems

US9732592B2 · kind B2 · utility

11Cited by
2References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 1, 2014
Grant dateAug 15, 2017
Priority date
Expiry dateMay 26, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01V2210/61
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Systems and methods for estimating well production performance in fractured reservoir systems using real-time down-hole temperature and stress information from advanced monitoring techniques.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.