Systems and methods for modeling interdependencies in batch processes
US9740198B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 15, 2014 |
| Grant date | Aug 22, 2017 |
| Priority date | — |
| Expiry date | Sep 5, 2035 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/02
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
According to various embodiments, an interdependency modeling method for controlling a batch process with an industrial automation system includes evaluating an input parameter expression residing in a level of a supervisory system of the industrial automation system to determine a value, transferring the value of the input parameter expression to a level of an equipment control system of the industrial automation system, transferring data from the level of the equipment control system to the level of the supervisory system, and evaluating an output parameter expression residing in the level of the supervisory system based on the data from the level of the equipment control system.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.