Charge pump timing control
US9742266B2 · kind B2 · utility
18Cited by
52References
36Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Sep 16, 2013 |
| Grant date | Aug 22, 2017 |
| Priority date | — |
| Expiry date | Sep 16, 2033 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02B70/10
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
Cycle timing of a charge pump is adapted according to monitoring of operating characteristics of a charge pump and/or peripheral elements coupled to the charge pump. In some examples, this adaptation provides maximum or near maximum cycle times while avoiding violation of predefine constraints (e.g., operating limits) in the charge pump and/or peripheral elements.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.