Task management integrated design environment for complex data integration applications
US9805326B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 24, 2014 |
| Grant date | Oct 31, 2017 |
| Priority date | — |
| Expiry date | Dec 23, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Embodiments presented herein provide task management capabilities for designing a complex data integration workflow in an integrated design environment (IDE). A task management tool of the IDE allows a developer to tag various stages of a data integration workflow in a non-linear manner. When the task management tool receives a tag for a given stage, the task management tool identifies incomplete tasks associated with the stage and generates a task list that includes the incomplete tasks. The developer may return to completing any of the tasks in the workflow in any sequence as desired.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.