Managing computing resources by predicting resource usage
US9806956B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 24, 2017 |
| Grant date | Oct 31, 2017 |
| Priority date | — |
| Expiry date | Apr 24, 2037 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L43/16
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Resources can be managed by predicting resource usage. For example, a first computing resource having a first attribute with a first value can be identified. A second computing resource having a second attribute with a second value can also be identified. A configuration parameter can be determined based on at least one of historical data or a predetermined probability. A predetermined model can be used to predict a first amount of interest in the first computing resource based on the first value, the second value, and the configuration parameter. The predetermined model can also be used to predict a second amount of interest for the second computing resource based on the first value, the second value, and the configuration parameter. Information related to the predicted first amount of interest in the first computing resource and the predicted second amount of interest in the second computing resource can be transmitted.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.