Method for management and optimization of hydropower generation and consumption
US9811061B1 · kind B1 · utility
Inventors
Key dates
| Filing date | Oct 14, 2013 |
| Grant date | Nov 7, 2017 |
| Priority date | — |
| Expiry date | Oct 30, 2035 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S10/50
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
An optimization and management system using a global linearization approach and mixed integer linear programming to perform the dispatch and to schedule a river system for ten days forward while subject to real world, hourly physical, biological, environmental, and recreational constraints. The optimizer system uses a combination of slack variables and stitching methods to approximate a highly nonlinear optimization problem, thereby generating realtime generation schedules to promote to the management authority.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.