Patent · US Active

Managing information at a construction site

US9817839B2 · kind B2 · utility

10Cited by
25References
27Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 29, 2012
Grant dateNov 14, 2017
Priority date
Expiry dateFeb 21, 2033

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q50/08
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method for managing information at a construction site is disclosed. In one embodiment, task data is received from a handheld tool at a construction site. A database is populated with the task data such that the task data can be retrieved from the database. The task data is then used to generate at least one report.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.