Managing information at a construction site
US9817839B2 · kind B2 · utility
10Cited by
25References
27Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Nov 29, 2012 |
| Grant date | Nov 14, 2017 |
| Priority date | — |
| Expiry date | Feb 21, 2033 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q50/08
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A method for managing information at a construction site is disclosed. In one embodiment, task data is received from a handheld tool at a construction site. A database is populated with the task data such that the task data can be retrieved from the database. The task data is then used to generate at least one report.