Demand accommodation changing order determination method
US9825728B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 23, 2015 |
| Grant date | Nov 21, 2017 |
| Priority date | — |
| Expiry date | Jan 14, 2036 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L41/0823
- WIPO fieldTelecommunications
- WIPO sectorElectrical engineering
Abstract
A processor executes the following processes. An obtainment process obtains a first number of lines, which represents a number of lines that are deleted after changing, among lines that pass through the same line route. An extraction process extracts a line for which a first demand, which is accommodated before and after changing, does not exist. The extraction process further extracts lines in descending order of a band of the first demand from among lines including first demands until a total number of extracted lines reaches the first number of lines when the number of the extracted lines is smaller than the first number of lines. Then, a fixation process fixes a first demand accommodated in a line that has not been extracted. A deletion process deletes the extracted lines. A determination process determines an order of changing line routes of demands.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.