Patent · US Active

Train asset availability and reliability management system

US9828013B2 · kind B2 · utility

3Cited by
3References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 9, 2015
Grant dateNov 28, 2017
Priority date
Expiry dateDec 30, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG07C5/085
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A method for managing train assets increases the time between required maintenance of the train assets, improves the future availability of the train assets, or increases the likelihood that the train assets will successfully complete future missions. A controller may receive from a sensor on a train asset a real-time signal indicative of at least one of a measured operational characteristic or a maintenance activity associated with the train asset, receive from a memory prognostic data providing information on a likelihood the train asset will complete a mission, and simulate a hypothetical operational scenario (HOS) based at least in part on the prognostic data and involving one or more train assets. Predictive data associated with the HOS may provide information on a likely benefit to a train asset from a change in at least one of an operational parameter, designated operational configuration for the train assets, or maintenance-related activity.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.