Interleave-scheduling of correlated tasks and backfill-scheduling of depender tasks into a slot of dependee tasks
US9836324B2 · kind B2 · utility
1Cited by
0References
16Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Feb 7, 2014 |
| Grant date | Dec 5, 2017 |
| Priority date | — |
| Expiry date | Jun 15, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2209/484
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Methods and arrangements for assembling tasks in a progressive queue. At least one job is received, each job comprising a dependee set of tasks and a depender set of at least one task. The dependee tasks are assembled in a progressive queue for execution, and the dependee tasks are executed. Other variants and embodiments are broadly contemplated herein.