Interleave-scheduling of correlated tasks and backfill-scheduling of depender tasks into a slot of dependee tasks

US9836324B2 · kind B2 · utility

1Cited by
0References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 7, 2014
Grant dateDec 5, 2017
Priority date
Expiry dateJun 15, 2034

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/484
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Methods and arrangements for assembling tasks in a progressive queue. At least one job is received, each job comprising a dependee set of tasks and a depender set of at least one task. The dependee tasks are assembled in a progressive queue for execution, and the dependee tasks are executed. Other variants and embodiments are broadly contemplated herein.