Patent · US Active

Scheduling inspections and predicting end-of-life for machine components

US9841756B2 · kind B2 · utility

2Cited by
1References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 27, 2015
Grant dateDec 12, 2017
Priority date
Expiry dateAug 31, 2036

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2119/04
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method for operating a machine component under stress. The method comprises determining a probability of failure PoF(N) of the component as a function of N cycles, selecting a time-based acceptable risk limit for the component and selecting an operational profile for the component, converting the time-based acceptable risk limit to a cycle-based acceptable risk limit using the operational profile, comparing the cycle-based acceptable risk limit with the PoF(N) values to determine an operational status of the component, comparing the cycle-based acceptable risk limit with the PoF(N) values, and operating the machine component responsive to results of the comparing step.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.