Patent · US Active

Cluster management of distributed applications

US9860311B1 · kind B1 · utility

4Cited by
3References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 17, 2015
Grant dateJan 2, 2018
Priority date
Expiry dateJan 10, 2036

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F15/161
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method includes performing at a lifecycle manager a first process. The first process includes determining nodes in a cluster to run an application, determining a difference between a cluster goal state and a cluster actual state for the application, determining goal state for each node and sending respective goal state to agents. The method also includes performing at each agent a second process. The second process includes determining a difference between the goal state of the node and an actual state of the node, determining actions to be performed based on the difference between the goal state of the node and the actual state of the node and sending actions to resource managers to perform based on the difference between the goal state of the node and the actual state of the node.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.