Enhancing initial resource allocation management to provide robust reconfiguration
US9864634B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 6, 2012 |
| Grant date | Jan 9, 2018 |
| Priority date | — |
| Expiry date | Nov 22, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/50
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A description of a resource associated with a service of an entity can be captured. The service can be associated with one or more resources, a constraint, and a demand. The resource can be associated with one or more characteristics including a utility, a limited availability, and a consumption rate. The entity can be an organization or a system. An initial allocation problem associated with the resource can be formulated as a two phase problem. The first phase can be an optimization problem and the second phase can be a restricted allocation problem. The initial allocation problem can be associated with reconfiguring a previously established allocation of a baseline scenario. The optimization problem can be solved optimally or approximately to establish a favorable allocation. The favorable allocation can minimizes the reconfiguration cost of the reconfiguring. The baseline scenario can be a normal operation of the service.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.