Patent · US Active

Priority-aware power capping for hierarchical power distribution networks

US9880599B1 · kind B1 · utility

12Cited by
5References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 12, 2016
Grant dateJan 30, 2018
Priority date
Expiry dateOct 24, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S40/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A mechanism is provided for throttling power utilized by a set of power consumption devices using priority-aware power capping. Responsive to unassigned power budget remaining in the overall power budget after a minimum power budget value has been assigned to the child device based on an associated priority of the child device, an additional power budget value equal to a remaining priority-based exposed power demand value of the child device is assigned to the child device in response to the remaining unassigned power budget being greater than or equal to the remaining priority-based demanded power value thereby forming a total power budget for the child device. Responsive to design limitations of power distribution equipment in the data processing system or contractual limits of the data processing system being reached, a throttling is implemented by each child device based on the total power budget assigned to the child device.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.