System and method for performing distributed power management without power cycling hosts
US9891699B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 18, 2014 |
| Grant date | Feb 13, 2018 |
| Priority date | — |
| Expiry date | Mar 30, 2035 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D10/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Power consumption by a first host included in a plurality of hosts in a clustered computing system, where each of the hosts executes one or more applications, is managed by detecting that a utilization level of the first host falls below a threshold value and, responsive to the detecting, migrating one or more applications executing on the first host to a second host. After the migration is completed, the first host is caused to consume less power while remaining powered on.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.