Patent · US Active

Method for operating a wind energy installation, and wind energy installation

US9938961B2 · kind B2 · utility

0Cited by
5References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 21, 2015
Grant dateApr 10, 2018
Priority date
Expiry dateMar 20, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E10/728
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method for operating a wind energy installation having a tower, a nacelle arranged on the tower, the azimuth of which can be adjusted, and a rotor having at least one rotor blade, the blade angle of which can be adjusted, in which tower oscillations are detected and monitored during operation using at least one measuring apparatus and power operation is switched off if a sliding average of the tower oscillations exceeds a tower oscillation limit value. The tower oscillation limit value is defined, at least during load operation of the wind energy installation, as at least one limit value function which is dependent on a sliding average of prevailing wind speed and/or a parameter associated therewith, and has different functional dependencies in a plurality of different value ranges of the prevailing wind speed or the parameter associated therewith. The invention also relates to a wind energy installation.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.