Resource system management
US9940211B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 12, 2013 |
| Grant date | Apr 10, 2018 |
| Priority date | — |
| Expiry date | Sep 27, 2033 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/2094
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A resource system comprises a plurality of resource elements and a resource controller connected to the resource elements and operating the resource elements according to a predefined set of operational goals. A method of operating the resource system comprises the steps of identifying error recovery procedures that could be executed by the resource elements, categorizing each identified error recovery procedure in relation to the predefined set of operational goals, detecting that an error recovery procedure is to be performed on a specific resource element, deploying one or more actions in relation to the resource elements according to the categorization of the detected error recovery procedure, and performing the detected error recovery procedure on the specific resource element.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.