Workload migration across a hybrid network

US9942323B2 · kind B2 · utility

5Cited by
2References
30Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 15, 2017
Grant dateApr 10, 2018
Priority date
Expiry dateMay 15, 2037

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L67/5681
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A method and system for workload migration across a hybrid network is provided. The method and system are directed to migrating a workload to a cloud by transferring the workload computing processes to the cloud, streaming workload data as necessary to execute the workload processes in the cloud, transferring the remaining workload data in a background process to cloud storage, and then completing migration by switching the primary data source of the workload computing processes to the cloud storage.