Patent · US Active

Power controller with turn-on time configured according to number of current limit operations

US9985539B1 · kind B1 · utility

0Cited by
8References
5Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 14, 2017
Grant dateMay 29, 2018
Priority date
Expiry dateNov 14, 2037

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02B70/10
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A power controller is provided. The power controller has a peak current setting unit utilized for deciding a peak current value according to a divided input voltage and a current limit turn-on time value. The comparator sends a first trigger signal once a current value of a power switch of the power system reaches the peak current value. The turn-on time calculation module defines the number of current limit operations by using the count of first trigger signals received in a calculation time period and then processes a recursive calculation to calculate a turn-on time value according to the current limit turn-on time value, the number of current limit operations, and a target number of current limit operations. The timer transmits a second trigger signal when the set turn-on time value is counted. The switch control module turns off the power switch when receiving one of the first and the second trigger signal.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.