Managing migration of an application from a source to a target
US9992280B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 5, 2017 |
| Grant date | Jun 5, 2018 |
| Priority date | — |
| Expiry date | May 5, 2037 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2009/4557
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Aspects of the disclosure relate to managing migration of an application. The managing migration of an application includes establishing a source dataset. The source dataset includes a set of source features. The source features relate to a source. The source includes the application. A determination of a first set of migration plans is made. The determination is made with an evaluation. The evaluation is made using the source dataset and a set of legacy features. The evaluation is performed with a cost measure. The application is migrated from the source to the target. The migration is based on the determined first set of migration plans.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.