Patent · US Active

Generating electric substation load transfer control parameters

US9997911B2 · kind B2 · utility

2Cited by
2References
8Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 21, 2015
Grant dateJun 12, 2018
Priority date
Expiry dateNov 22, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S10/50
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method for generating electric substation load transfer control parameters includes adjusting elements in a fundamental scale matrix according to a condition change of a power grid, wherein the fundamental scale matrix is constructed based on the topology structure of the power grid, and the elements in the fundamental scale matrix represent switch information and risk values of paths between nodes of the power grid, wherein the switch information represents number of switching times required for connecting two nodes of the power grid; and performing operations on the adjusted fundamental scale matrix to generate switch information and risk values of paths for electric substation load transfer control, as electric substation load transfer control parameters.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.