Load management
US9998953B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 17, 2013 |
| Grant date | Jun 12, 2018 |
| Priority date | — |
| Expiry date | Jun 17, 2033 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04W84/045
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
The disclosure is related to adaptive load management in a femtocell network. A load state of a femtocell base station may be determined as one of a low load state, a middle load state, and a high load state. According to the determined load state, a reserved service capacity and an available service capacity of the femtocell base station may be adaptive controlled. Furthermore, at least one handover trigger condition associated with the femtocell base station may be controlled according to the determined load state of the femtocell base station.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.