Patent · US Expired

System for providing assured power to a critical load

USRE39710E1 · kind E1 · reissue

7Cited by
13References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 16, 2004
Grant dateJul 3, 2007
Priority date
Expiry dateMar 16, 2024

Classification

  • Technology area (CPC —)General

Abstract

A power system (8) is provided for economically supplying uninterrupted electrical power to one or more critical loads (14). One or more fuel cell power plants (18) provide one substantially continuous source of power, and a utility grid (10) provides another source of power. The fuel cell power plants (18) are adapted to be, and are, normally substantially continuously connected and providing power to, the critical load(s) (14). A rapidly-acting static switch (19) selectively connects and disconnects and reconnects the grid power supply (10) to the critical load(s) (14) and with the fuel cell power plant(s) (18) for abnormal and normal grid operation, respectively. A switch controller (49, 45) controls the state of the static switch (19) to connect the grid power source (10) with the critical load(s) (14) and the rapidly (less than 4 ms) make the disconnections and the reconnections. The fuel cell power plant(s) (18) during normal operation of the grid (10), and to rapidly (less than 4 ms) disconnect the grid power source (10) from the load(s) (14) and the fuel cell power plant(s) (18) when operation of the grid (10) deviates from normal beyond a limit. each include power cond…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.