Congestion control in electric power system under load and uncertainty
US10404067B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 9, 2016 |
| Grant date | Sep 3, 2019 |
| Priority date | — |
| Expiry date | May 3, 2037 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S40/20
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A method for operating a power generating facility connected to a power distribution grid having an uncertain power generation condition includes predicting a probabilistic power flow forecast in a transmission line of the power distribution grid for a period of time, wherein the transmission line is electrically coupled to the power generating facility, predicting, using the probabilistic power flow forecast, a probability of congestion over the transmission line of the power distribution grid during the period of time, generating a mitigation plan, including a load adjustment on the transmission line, using the probability of congestion predicted over the transmission line and a thermal limit constraint of the transmission line, wherein the mitigation plan balances the load adjustment and an overlimit line capacity on the transmission line, and controlling the power generating facility, using the mitigation plan, to achieve the load modification and mitigate the probability of congestion predicted in the transmission line.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.