Dung Phan
39Patents
4h-index
29Co-inventors
63Inventor score
Filing activity: Aug 6, 2001 → Aug 16, 2022
Most-cited inventions
| Patent | Title | Area | Cited by | Status |
|---|---|---|---|---|
| US9959514B2 | Optimized asset maintenance and replacement schedule | Emerging Cross-Sectional Technologies | 15 | Active |
| US6521271B1 | Compositions and methods of treatment for skin conditions using extracts of turmeric | Human Necessities | 12 | Expired |
| US9260031B2 | Distributed charging of electrical assets | Emerging Cross-Sectional Technologies | 6 | Active |
| US10013289B2 | Performing automatic map reduce job optimization using a resource supply-demand based approach | Physics | 5 | Active |
| US9953117B2 | Planning economic energy dispatch in electrical grid under uncertainty | Emerging Cross-Sectional Technologies | 4 | Active |
| US11542815B2 | Determining effect of oxidative hydraulic fracturing | Physics | 4 | Active |
| US7291446B2 | Method and system for treating a hard mask to improve etch characteristics | Physics | 3 | Expired |
| US9959515B2 | Optimized asset maintenance and replacement schedule | Emerging Cross-Sectional Technologies | 3 | Active |
| US8606420B2 | Solving large-scale security-constrained economic dispatch problem in real-time | Electricity | 2 | Active |
| US9058443B2 | Planning economic energy dispatch in electrical grid under uncertainty | Emerging Cross-Sectional Technologies | 2 | Active |
| US11519879B2 | Two methods of determining permeabilities of naturally fractured rocks from laboratory measurements | Physics | 2 | Active |
| US9229437B2 | Solving large-scale security-constrained economic dispatch problem in real-time | Electricity | 2 | Active |
| US9058444B2 | Planning economic energy dispatch in electrical grid under uncertainty | Emerging Cross-Sectional Technologies | 2 | Active |
| US11181564B2 | Distributed control of electric power grids | Physics | 1 | Active |
| US11486244B2 | Systems and methods for determining mud weight window during wellbore drilling | Fixed Constructions | 1 | Active |
| US9552007B2 | Parallel technique for computing problem functions in solving optimal power flow | Electricity | 1 | Active |
| US10591945B2 | Parallel technique for computing problem functions in solving optimal power flow | Electricity | 1 | Active |
| US11952882B2 | Method for the determination of mud weight window in N-porosity N-permeability formations | Physics | 0 | Active |
| US11676039B2 | Optimal interpretable decision trees using integer linear programming techniques | Physics | 0 | Active |
| US12399292B2 | Method for determining connected and non-connected porosities | Physics | 0 | Active |
| US11828169B2 | Method of determining in-situ pore pressure in chemically active formations | Physics | 0 | Active |
| US11656606B2 | Site-wide operations management optimization for manufacturing and processing control | Physics | 0 | Active |
| US10404067B2 | Congestion control in electric power system under load and uncertainty | Emerging Cross-Sectional Technologies | 0 | Active |
| US11680469B2 | Method and system for autonomous flow rate control in hydraulic stimulation operations | Fixed Constructions | 0 | Active |
| US12417409B2 | Determining and selecting prediction models over multiple points in time using test data | Physics | 0 | Active |
Source: USPTO / EPO open patent data. Inventor disambiguation is heuristic; counts are objective bibliographic measures.