Patent · US Active

Method for determining optimal laying arrangement of infrastructure link

US10425280B2 · kind B2 · utility

2Cited by
2References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 17, 2017
Grant dateSep 24, 2019
Priority date
Expiry dateOct 17, 2037

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L45/124
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A method for determining an optimal laying arrangement of a new infrastructure link for connection from a new site to an existing infrastructure network includes modeling a terrain of a region around and at the new site and the existing infrastructure network near the new site; modeling each factor affecting the laying arrangement as a respective cost function; applying a respective weighting to each of the cost function to determine a life-cycle cost function; and determining, based on the determined life-cycle cost function, an optimized laying arrangement with minimal life-cycle cost from the new site to a connection point in the existing infrastructure network.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.