Network optimization
US11775852B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 29, 2019 |
| Grant date | Oct 3, 2023 |
| Priority date | — |
| Expiry date | Aug 3, 2042 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06N3/045
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A system may receive a cluster prediction requirement. The system may determine a first node conglomerate by sorting a first dataset into a first plurality of nodes. The system may determine a plurality of attributes by sorting a second dataset associated with the cluster prediction requirement. The system may determine a second node conglomerate for each of the plurality of attributes. A node confidence score may be assigned to each of the second plurality of nodes. The system may determine a node graph based on a comparison between the first node conglomerate and the second node conglomerate. The node graph may be iteratively modified based on a node optimization threshold value to generate a harmonized node graph. The node optimization threshold value may be based on a map confidence score allotted to the node graph.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.