Patent · US Active

Scheduling tasks using work fullness counter

US11868807B2 · kind B2 · utility

0Cited by
28References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 17, 2021
Grant dateJan 9, 2024
Priority date
Expiry dateDec 16, 2041

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/3851
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method of activating scheduling instructions within a parallel processing unit includes checking if an ALU targeted by a decoded instruction is full by checking a value of an ALU work fullness counter stored in the instruction controller and associated with the targeted ALU. If the targeted ALU is not full, the decoded instruction is sent to the targeted ALU for execution and the ALU work fullness counter associated with the targeted ALU is updated. If, however, the targeted ALU is full, a scheduler is triggered to de-activate the scheduled task by changing the scheduled task from the active state to a non-active state. When an ALU changes from being full to not being full, the scheduler is triggered to re-activate an oldest scheduled task waiting for the ALU by removing the oldest scheduled task from the non-active state.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.