Full-day train operation diagram generation method based on time division scheme and activity-event relationship

US12139185B2 · kind B2 · utility

0Cited by
0References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 19, 2020
Grant dateNov 12, 2024
Priority date
Expiry dateAug 27, 2041

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/047
  • WIPO fieldTransport
  • WIPO sectorMechanical engineering

Abstract

The present invention relates to a full-day in each train operation diagram generation method based on a time division scheme and an activity-event relationship, the method including: S1: configuring operation scheme basic parameters; S2: constructing a quantitative relationship between a travel time and a driving interval for different routing ratios and calculating, within a given turn-back time range, an actual turn-back time of each turn-back station that can achieve a routing ratio requirement; S3: generating an arrival event time and a departure event time of a train in each time period at a station platform in accordance with routing division, direction division, and proportion division, correcting a start time and a stop time of each routing in accordance with time period division, and performing transition between the time periods; and S4: connecting a train section operation activity and a stop activity according to the full-time train arrival and departure event times obtained by executing step S3 for a plurality of times, matching an underbody turn-back activity with ex-warehousing and warehousing activities, and correcting arrival and departure times related to a track…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.