Patent · US Expired

Real-time scheduling system

US4888692A · kind A · utility

59Cited by
7References
7Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 10, 1988
Grant dateDec 19, 1989
Priority date
Expiry dateNov 10, 2008

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A system for scheduling the operation of interrelated machines which perform a process flow. A global definition of the system is made once, and each machine has an individual profile describing its local interaction with the system. Local scheduling decisions for each machine are made based on that machines individual profile and the state of the manufacturing facility at the time a decision is needed. Operation of the individual machines is controlled by the local scheduling decisions made therefor.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.