Method for planning, scheduling and managing personnel

US5911134A · kind A · utility

193Cited by
4References
4Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 12, 1990
Grant dateJun 8, 1999
Priority date
Expiry dateOct 12, 2010

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04M2203/402
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method for planning, scheduling and managing personnel in an environment in which there is a varying workload by time of day and by day of week to be staffed with a team having a variable number of servers. The method begins by organizing the team of servers into a plurality of management units, each management unit having one or more groups of individual servers. One or more tour templates, each describing a bounded work shift having work rules and operating constraints, are then defined. A forecast is then generated of an event load expected to occur during a forecast time period and a number of servers required to service the expected event load during the forecast time period. The method then allocates expected event load among the plurality of management units according to a predetermined number of servers expected to be available at each management unit during the forecast time period. Thereafter, the tour templates are correlated with the forecast to generate a set of tours for each management unit, each tour defining a work schedule for the forecast time period for a theoretical server of the management unit. The individual servers of each management unit are then assigne…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.