Method and apparatus for evaluating bids for scheduling a resource
US6801819B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 30, 2002 |
| Grant date | Oct 5, 2004 |
| Priority date | — |
| Expiry date | Dec 24, 2022 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A method for scheduling a resource for processing a workpiece includes defining a commitment window having a kernel specifying a time period required for processing the workpiece. A plurality of candidate bids having candidate commitment windows within the commitment window with varying start times, end times and candidate commitment window sizes is generated. A cost for each of the plurality of candidate bids is determined. A flexibility discount is applied to the cost of the candidate bid. Each candidate bid is evaluated in accordance with an objective function. A candidate bid is selected for scheduling the resource based on the objective function evaluation. A system includes a resource for processing a workpiece and at least one scheduling agent. The scheduling agent is configured to define a commitment window having a kernel specifying a time period required for processing the workpiece, generate a plurality of candidate bids having candidate commitment windows within the commitment window with varying start times, end times and candidate commitment window sizes, determine a cost for each of the plurality of candidate bids, apply a flexibility discount to the cost of the cand…
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.