Abstract
A method to generate an optimum phase shifted sampling clock for sampling a synchronized video signal A(t) having a synchronization signal SYNC pulse is achieved. The method comprises, first, generating a sampling clock having a first edge aligned with a trailing edge of the SYNC pulse. The sampling clock period comprises the SYNC pulse period divided by M. Second, the number of sampling clock cycles N is counted from the trailing edge of the SYNC pulse until the A(t) value at the first edge of the sampling clock exceeds a minimum value. Third, the sampling clock and the SYNC pulse are phase shifted forward until the A(t) value at the first edge of the sampling clock first exceeds a minimum value on clock cycle N−1 to thereby establish a worst case phase shift of the sampling clock. Finally, A(t) is sampled at an offset from the worst case phase shift to thereby generate an optimum phase shifted sampling clock.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.