Patent · US Expired

Method and system for employee work scheduling

US7058589B1 · kind B1 · utility

51Cited by
11References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 17, 1999
Grant dateJun 6, 2006
Priority date
Expiry dateDec 17, 2019

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S707/99933
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method is provided for assigning a group of agents to a plurality of available schedules, including determining preferences for a plurality of factors for each agent. Each agent provides an order of importance for the plurality of factors. For each factor, a difference value for that factor between a preliminarily assigned schedule (or pool of unassigned schedules) and each agent's preference for that factor is determined. The difference value for each factor is assigned to a vector for each agent. Then, for each agent, a vector for each schedule not assigned to that agent is determined. Vectors for every other agent are also calculated for every schedule swap involving the current agent. The schedule having the lowest vector is then assigned for each agent.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.