Patent · US Expired

Bus precharge during a phase of a clock signal to eliminate idle clock cycle

US7076582B2 · kind B2 · utility

1Cited by
16References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 24, 2004
Grant dateJul 11, 2006
Priority date
Expiry dateSep 24, 2024

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F13/4077
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A system includes a bus and a circuit for precharging the bus. The circuit may be coupled to receive a clock signal associated with the bus, and may be configured to precharge a bus during an interval of the period of the clock signal, the interval being between a first edge (rising or falling) and the subsequent edge (falling or rising). A second interval within the period and excluding the interval may be used to perform a bus transfer. In this manner, both precharging and transfer may be performed in the same clock cycle. Bandwidth of the bus may be improved since transfers may occur each clock cycle, rather than having a non-transfer clock cycle for precharging.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.