Operator location tracking for remote control rail yard switching
US7239943B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Feb 15, 2005 |
| Grant date | Jul 3, 2007 |
| Priority date | — |
| Expiry date | Aug 17, 2025 |
Classification
- Technology area (CPC B)Performing Operations; Transporting
- CPC primaryB61L2205/04
- WIPO fieldTransport
- WIPO sectorMechanical engineering
Abstract
A system (10) for generating a rail yard switch list (e.g., 30) of switch positioning activities for efficient movement of a railyard operator (12). The system includes a first operator control unit (14) (OCU) having a locator (16) for determining a location of the OCU and an associated operator using the OCU during rail yard switching activities. The system also includes a first processor (28) for correlating the rail yard switching activities with a respective location of the OCU in the rail yard to establish a knowledge base of respective preferred locations in the rail yard, and a memory (e.g. 26) for storing the knowledge base of preferred locations in the railyard. The system further includes a second processor (27) for receiving a request (32) for a switch list, accessing the memory, and processing the request based on the knowledge base to generate a switch list.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.