Patent · US Active

Systems and methods for automatic scheduling of a workforce

US7672746B1 · kind B1 · utility

27Cited by
149References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 31, 2006
Grant dateMar 2, 2010
Priority date
Expiry dateSep 30, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/103
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems and methods are disclosed for scheduling overtime and time-off for a workforce. In one embodiment, the method comprises: receiving a workforce schedule including assignments of workers to shifts; receiving a template describing alterations to shifts; and applying schedulable objects to the workforce schedule in accordance with a workload forecast and schedule constraints. In one embodiment, the system comprises: a user interface and a scheduler. The user interface allows creation of shift alteration templates and associating templates with workers. The scheduler uses the shift alteration templates to modify an existing schedule of assignments of workers to shifts.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.