Patent · US Active

Systems and methods for automatic scheduling of a workforce

US8463638B2 · kind B2 · utility

8Cited by
6References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 12, 2010
Grant dateJun 11, 2013
Priority date
Expiry dateJan 12, 2030

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/103
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems and methods are disclosed for scheduling overtime and time-off for a workforce. In one embodiment, a method of workforce scheduling to handle an expected workload comprises, in an instruction execution system, receiving a first workforce schedule describing existing assignments of a plurality of workers to a plurality of shifts, each of the shifts being associated with a time range and a day; in response to a variance in the expected workload, selecting a modification to the first workforce schedule required to handle the variance in the expected workload during the day; and producing a second workforce schedule that modifies the length of at least one of the plurality of shifts to accommodate the modification to the first workforce schedule.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.