Patent · US Active

Two-pass linear complexity task scheduler

US8850437B2 · kind B2 · utility

5Cited by
10References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 7, 2011
Grant dateSep 30, 2014
Priority date
Expiry dateDec 11, 2032

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5066
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method for two-pass scheduling of a plurality of tasks generally including steps (A) to (C). Step (A) may assign each of the tasks to a corresponding one or more of a plurality of processors in a first pass through the tasks. The first pass may be non-iterative. Step (B) may reassign the tasks among the processors to shorten a respective load on one or more of the processors in a second pass through the tasks. The second pass may be non-iterative and may begin after the first pass has completed. Step (C) may generate a schedule in response to the assigning and the reassigning. The schedule generally maps the tasks to the processors.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.