Predicting power management state duration on a per-process basis and modifying cache size based on the predicted duration
US9720487B2 · kind B2 · utility
1Cited by
10References
18Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jan 10, 2014 |
| Grant date | Aug 1, 2017 |
| Priority date | — |
| Expiry date | Jul 31, 2034 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D30/50
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Durations of power management states are predicted on a per-process basis. Some embodiments include storing, in one or more data structures associated with one or more processes, information indicating previous durations of a power management state associated with the process(es). Some embodiments also include predicting a subsequent duration of the power management state for the process(es) using information stored in the data structure(s).
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.