Patent · US Active

Optimized asset maintenance and replacement schedule

US9959514B2 · kind B2 · utility

15Cited by
2References
11Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 24, 2014
Grant dateMay 1, 2018
Priority date
Expiry dateOct 4, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

There are provided a system, a method and a computer program product for generating an optimal preventive maintenance/replacement schedule for a set of assets. The method includes receiving data regarding an asset, said data including a failure rate function of said asset, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset. An optimal number K of preventative maintenance time intervals tk and an indication of a possible replacement is computed and stored for each asset by minimizing a mean cost-rate value function with respect to an electrical age of the asset. A first PM schedule is formed without consideration of labor and budget resource constraints. The method further generates a second maintenance schedule for a system of assets by minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.