Patent · US Active

Balancing computation and communication power in power constrained clusters

US9983652B2 · kind B2 · utility

16Cited by
12References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 4, 2015
Grant dateMay 29, 2018
Priority date
Expiry dateFeb 2, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Systems, apparatuses, and methods for balancing computation and communication power in power constrained environments. A data processing cluster with a plurality of compute nodes may perform parallel processing of a workload in a power constrained environment. Nodes that finish tasks early may be power-gated based on one or more conditions. In some scenarios, a node may predict a wait duration and go into a reduced power consumption state if the wait duration is predicted to be greater than a threshold. The power saved by power-gating one or more nodes may be reassigned for use by other nodes. A cluster agent may be configured to reassign the unused power to the active nodes to expedite workload processing.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.