Method and system for controlling process tools by interrupting process jobs depending on job priority
US7571020B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Jan 3, 2007 |
| Grant date | Aug 4, 2009 |
| Priority date | — |
| Expiry date | Sep 7, 2027 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/02
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
By enabling an interleaved mode when supplying substrates from a plurality of load ports to a respective process module, a reduction of non-productive time of the process tool and/or a reduction of cycle time may be achieved compared to a conventional sequential processing of carriers. Upon arrival at a load port of the process tool, an appropriate priority may be assigned to the carrier, wherein a higher priority may enable the interruption of the processing of a lower-ranked substrate carrier.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.